For Owners Corporations & Committees

Finally an EV charging solution that works for the whole building

Ready Steady Plug enables EV charging in strata buildings without overloading infrastructure or shifting costs onto non-EV owners.

The challenge

As more residents adopt electric vehicles, Owners Corporations are expected to provide charging access that is fair, safe, and future-ready.

Most EV charging solutions often require high upfront investment, complex electrical upgrades, and ongoing administration. They can also create disputes around electricity costs and long-term responsibility.

How Ready Steady Plug works

Ready Steady Plug is a managed EV charging system built around standard 15A power outlets and centralised control.

Charging is monitored and adjusted across the entire building to stay within safe electrical limits. Each outlet is individually metered, protected, and billed, ensuring fairness between residents.

What this means in practice

The system is designed to grow with demand, without committing the building to unnecessary infrastructure upfront.

  • Charging operates within existing electrical capacity, with load managed automatically to prevent demand spikes.

  • The modular setup allows infrastructure to be added progressively, aligning costs with actual EV adoption.

  • Active load management reduces long-term electrical risk and protects existing building electrical infrastructure.

  • The system uses standard electrical components with no vendor lock-in, keeping future options open.

The ReadySteadyPlug ecosystem

Secure charging

Standard 15A outlets with controlled access, energy metering, and user billing.

Centralised control

A controller manages charging across the building and prevents electrical overload.

User-Friendly App

Residents track usage and billing. Managers monitor and manage the system remotely.

Case Studies

Meadowbank, NSW

Multi-level basement charging delivered to 154-lot Meadowbank strata with no Wi-Fi or mobile signal, fully managed at building level.

North Ryde, NSW

EV charging rolled out for a 160-lot North Ryde strata without major upgrades, starting small and designed to scale to full coverage.

Book a site visit

We assess your building’s electrical capacity, parking layout, and rollout options.

Book a site visit